DesignFlow

Stormwater Asset Management
Sandhurst Crescent Sediment Basin Rectification
Client: Gold Coast City Council
Since construction, the sediment basin and flood storage at Sandhurst Crescent has proved difficult to maintain and has experienced scour and excessive weed growth. As a result, the system does not operate in accordance with the design intent and requires rectification. DesignFlow were commissioned by Gold Coast City Council to review the existing system and identify a practical rectification solution which allows cost effective management. A range of rectification options and associated costs were identified by DesignFlow, with Council with the final solution selected via a simple workshop session at the site.