This transformation improved the quality of both water in the lake and the stormwater discharged to the Pine River. The work involved water quality and sediment sampling and analysis, site characterization (site character, site use, natural features, management issues), detailed hydraulic and catchment modeling, and the detailed design and construction supervision.